C3 |
Three years of calibration coverage based on the R&S recommended calibration interval - includes test data. The first calibration is included with product delivery with 2 additional depot calibration(s). |
C5 |
Five years of calibration coverage based on the R&S recommended calibration interval - includes test data. The first calibration is included with product delivery with 4 additional depot calibration(s). |
CRTC-DKD |
CRTC DKD (ISO17025) calibration incl. ISO 9000 calibration (order only with device) |
CS-SC |
System cable set for CRTU-RRM |
CS8980MST |
Starter kit - cable set for TS8980RD |
DCV-2 |
Documentation of calibration values |
DCV-ZP |
Printout of DCV (additional, in combination with DCV-Option only) |
R5 |
REPAIR SERVICE 5 YEARS |
U11 |
GSM upgrade for CRTU-M to CRTU-MS for GSM and WCDMA operation |
U13 |
PPC upgrade for HSDPA performance tests from 3.6MBit/s RLC data rate |
W-C3 |
Three years of calibration coverage based on the R&S recommended calibration interval - includes test data. |
W-C5 |
Five years of calibration coverage based on the R&S recommended calibration interval - includes test data. |
W-R5 |
REPAIR SERVICE 5 YEARS |
WA01 |
Layer 1 test tools incl. HSDPA support |
WA02 |
WCDMA operating software extension HSDPA signalling |
WA03 |
WCDMA operating software extension inter RAT for CRTU-WT02 |
WA04 |
Operating software extension for frequency band III, IX, XI |
WA05 |
Operating software extension for frequency band IV, V, VI, X |
WA06 |
WCDMA operating software extension ciphering F8/KAZUMI 1/1 width, with connector tape |
WA07 |
Operating Software extension for frequency band VII, VIII, XV, XVI |
WA08 |
Operating Software extension for HSUPA signalling |
WA09 |
MBMS Signalling extension |
WA10 |
AMR-WB signalling extension |
WA11 |
IP interface and example scenarios for WCDMA/FDD protocol stack |
WA14 |
RMM Library for MLAPI Requires CRTU-WT02 |
WA16 |
Frequency band extension; Bands XII, XIII, XIV |
WA17 |
WCDMA operating software extension snow ciphering |
WA23 |
FDD III, IV and IX for RRM requires CRTU-WA04 and CRTU-WA05 |
WA24 |
FDDVII and VIII for RRM requires CRTU-WA07 |
WA27 |
HSxPA signalling for RRM can be used for CRTU-WC45 instead of |
WA41 |
Frequency band extension band S |
WC00 |
TTCN library for support of 3GPP 34.123 test cases (COMMON LIBRARY) version 5.0 |
WC01 |
TTCN library for support of 3GPP 34.123 test cases (NAS) version 5.0 |
WC02 |
TTCN library for support of 3GPP 34.123 test cases (RRC) version 5.0 |
WC03 |
TTCN library for support of 3GPP 34.123 test cases (RLC) version 5.0 |
WC04 |
TTCN library for support of 3GPP 34.123 test cases (MAC) version 5.0 |
WC05 |
TTCN library for support of 3GPP 34.123 test cases (IDLE) version 5.0 |
WC06 |
TTCN library for support of 3GPP 34.123 test cases (RADIO BEARER) version 5.0 |
WC07 |
TTCN library for support of 3GPP 34.123 test cases (SMS) version 5.0 |
WC10 |
Radio Resource Management functionality, common SIM lib. And TSO interface, CRTU-WC11 to CRTU-WC15 required |
WC11 |
Radio Resource Management test case package for setup CRTU-W, FSU03 |
WC12 |
Radio Resource Management test case package for setup CRTU-W, CRTU-G, FSU03 |
WC13 |
Radio Resource Management test case package for setup CRTU-W, FSU03 |
WC14 |
Radio Resource Management test case package for setup 2x CRTU-W, FSU03 |
WC15 |
Radio Resource Management test case package for setup CRTU-W, CRTU-G, FSU03 |
WC16 |
RRM Rel 5 Test Cases Part 1 for CRTU-W, |
WC40 |
RMM rel. 99 Test Cases for setup CRTU-W + FSU3 Replaces CRTU-WC11 and CRTU-WC13 |
WC41 |
RMM rel. 99 Test Cases for setup CRTU-W +CRTU-G/S + FSU3 Replaces CRTU-WC12 and CRTU-WC15 |
WC43 |
RRM rel. 5 Test Cases for setup CRTU-W +CRTU-M + ABFS + FSU3 Replaces CRTU-WC16 and CRTU-WC17 |
WC44 |
RRM Rel. 6 Test Cases of WI 24 (non HSUPA) |
WC45 |
RRM Rel. 6 Test Cases of WI 25 (HSUPA) |
WC51 |
TTCN library for support of 3GPP 34.123 test cases (HSDPA) version 5.0 |
WD04 |
WCDMA Serving Scenarios for Data Application Test Cases |
WE01 |
Test case executables according to 3GPP 34.123 (NAS) WI10/ 12 |
WE02 |
Test case executables according to 3GPP 34.123 (RRC/IDLE) WI10/12 |
WE03 |
Testcase executables according to 3GPP 34.123 (RLC) WI10/12 |
WE04 |
Test case executables according to 3GPP 34.123 (MAC) WI10/12 |
WE06 |
Test case executables according to 3GPP 34.123 (Radio Bearer) WI10/12 |
WE07 |
Test case executables according to 3GPP 34.123 (SMS) WI10/12 |
WE08 |
Test case executables according to 3GPP 34.123 (3GPP ats ir_g) WI10/12 |
WE09 |
Test case executables according to 3GPP 34.123 (3GPP ats ir_u) WI10/12 |
WE10 |
Test case executables according to 3GPP 34.123 (AGPS) WI 15 |
WE11 |
Test case executables according to 3GPP 34.123 (rel4/5 anh. and HSDPA) WI13/14 |
WE12 |
Test case executables according to 3GPP 34.123 (InterRAT HSDPA) WI13/14 |
WE13 |
Test case executables according to 3GPP 34.123 (rel6 anh. and HSUPA) WI24/25 |
WE14 |
Test case executables according to 3GPP 34.123 (InterRAT HSUPA) WI24/25 |
WE15 |
Test case executables for support of 3GPP 34.123 test cases, FDD interband handover WI47,51,52,53 |
WE16 |
Test case executables for support of 3GPP 34.123 test cases, MBMS WI49 |
WE17 |
Test case executables for support of 3GPP 34.123 ciphering/network selection enhancements |
WE18 |
Testcase executables for support of 3GPP 34.123 test cases, PLMN Selection Mode, RFT-67 & |
WF01 |
ATE Test Cases VT(video telephonie) from GCF WI19 |
WF02 |
3G A-GPS Minimum Performance Tests, test case executables for tests |
WG01 |
Development Environment ETSI ATS R3 |
WG02 |
Development Environment ETSI ATS R5 Extension |
WG03 |
Development Enviroment ESTI ATS R6 Extension |
WK01 |
Test scenarios: RRC incl. IRAT |
WK02 |
Testscenarios: HSxPA |
WK03 |
Test scenarios: AMR |
WK04 |
Test scenarios: network selection |
WK05 |
Test scenarios: UMTS Packet Switched |
WK06 |
Test scenarios: UMTS Multi RAB |
WK07 |
Test scenarios: Call Processing |
WK08 |
Testscenarios EDRC Enhanced Data Roaming Control Test Cases |
WK09 |
Test scenarios ENS ENS scenarios, require Comrion IT3 Prove |
WK10 |
Test scenarios EONS EONS scenarios, require Comprion IT3 Pro |
WO01 |
WCDMA FDD operational software for UE test |
WP03 |
Hardlock for PC tools (message analyzer, -composer, TTCN compiler, -editor) |
WP04 |
Message analyzer for PC (WCDMA) |
WP05 |
PC development framework for CRTU |
WP06 |
Message composer for PC (WCDMA) |
WP07 |
PICS/PIXIT editor for PC |
WP09 |
Test Case Explorer |
WR01 |
WCDMA RIT reference in-house testing test scenario package 1 |
WR02 |
WCDMA RIT reference in-house testing test scenario package 2 |
WR03 |
WCDMA RIT reference in-house testing test scenario package 3 |
WR04 |
Interoprability test scenarios package 4 |
WR05 |
Interoperability test scenarios Package 5 |
WR06 |
Interoperability test scenarios Package 6 |
WR07 |
RIT: C interoperability test scenarios, Package 7 (executable only) |
WR08 |
RIT: C interoperability test scenarios, Package 8 (executable only) |
WR3 |
Three years of depot repair coverage, including recalibration and test data if necessary to complete the repair. First year of repair coverage is provided by the 12-month new product warranty. |
WR51 |
Interoperability test scenarios. Package 1, source code |
WR52 |
Interoperability test scenarios Package 2, Source Code |
WR53 |
Interoperability test scenarios Package 3, Source Code |
WR54 |
Interoprability test scenarios Package 4, Source Code |
WR55 |
Interoperability test scenarios Package 5, Source Code |
WR56 |
Interoprability test scenarios Package 6, Source Code |
WR57 |
RIT: C Interopability test scenarios, Package 7 (Source code) |
WR58 |
RIT: C Interopability test scenarios, Package 8 (Source code) |
WS01 |
1 year technical support for CRTU-W and VT (operating software) |
WS02 |
CRTU WCDMA software upgrade contract, CRTU-W TTCN Simlibs and TTCN Tools |
WS03 |
CRTU WCDMA software upgrade contract, CRTU-W test scenarios |
WS05 |
1 year technical support for CRTU-W software (10776 scenarios) |
WT02 |
C programming tools |
WT03 |
TTCN editor and analyzer |
WT04 |
TTCN compiler |
WT13 |
TTCN ANALYZER |
WT14 |
TTCN Editor |
WT23 |
TTCN3 tools basic |
WT24 |
TTCN3 tools professional upgrade |
WZ01 |
Test Scenarios HSDPA, Package 1 |
WZ02 |
Test scenarios HSDPA, Package 2 |
WZ03 |
Test scenarios HSDPA, Package 3 |
WZ04 |
Test Scenarios InterRAT, Package 1 |
WZ05 |
Test scenarios InterRAT, Package 3 (DTM and neihbour cell reporting) |
WZ06 |
Test scenarios InterRat, Package 3 |
WZ08 |
Test scenarios MBMS |
WZ10 |
RMM MLAPI scenarios for setup CRTU-W + ABFS + FSU3 |
WZ11 |
RRM MLAPI scenarios for setup CRTU-W + CRTU-G/S + ABFS + FSU3 |
WZ12 |
RRM MLAPI scenarios for setup CRTU-W + CRTU-M + ABFS + FSU3 |
WZ20 |
Test scenarios WB-AMR |
WZ22 |
Test scenarios HSUPA, package 1 |
WZ23 |
Test scenarios HSUPA, package 2 |
WZ24 |
Test scenarios HSUPA, package 3 |
WZ25 |
Test scenarios HSUPA 4 |
WZ26 |
Test scenarios HSUPA InterRAT |
WZ27 |
MBMS scenarios 2. PS and CS services during MBMS BC reception (PTM), soft and selective |
WZ28 |
MBMS scenarios 3. MBMS Broadcast PTP reception, Switching between PTP and PTM |
WZ29 |
MBMS scenarios 4. InterRAT cell re-selection and Cell Change Order during MBMS |
Z12 |
Accessory:GSM 850/1900 test SIM card phase 2+; warrenty excluded |
Z2 |
Accessory: GSM 900/1800 test SIM card phase 2+; warranty excluded |
Z3 |
3G UICC/USIM test card test SIM card for UMTS (Warranty excluded) |
Z4 |
4 Way combiner, 1 HU 0.3 GHz - 3 GHz 6 dB loss |